- 24-04-24Status.bit.nl in nieuw jasje!
- 12-04-24Nieuw bij BIT: GPU hosting
- 25-03-24BIT breidt netwerkconnectiviteit uit met aansluiting op NL-ix^2
- 13-03-24No More Leaks: Samenwerken tegen cybercriminaliteit
- 03-03-24Geen verandering twee jaar na invoering sancties tegen Russische media: FOIC roept (wederom) op tot einde van ondemocratische censuur
- 29-01-24Onzichtbare upgrades
- 16-01-24BIT's Wido Potters wint Felipe Rodriquez Award voor inzet voor privacy
- 10-01-24BIT en partners zetten de koers voor een gedecentraliseerde Europese cloud met ECOFED-project
- 02-01-24Onze eigen stroom inkopen: de resultaten van 2023
- 24-11-23BIT Friday 2023
Maintenance BIT-2A UPS A-feed
11-12-2019 08:00:00
- 11-12-2019 17:00:00
Urgency: Planned
Affected services:
- Equipment in BIT-2A
Expected impact:
- Possible loss of power redundancy
Customer intervention required: No
Reference number: 164632
Summary:
Our supplier will be performing maintenance on our A-feed UPS in BIT-2A. During this maintenance our supplier will replace the batteries on the A-feed of the UPS with new batteries.
Details:
During the battery replacement, at least one feed will be available continuously. During this maintenance one of the four UPSs of the A-feed will be put in bypass mode. We do not expect any disruption in the A-feed power supply. The remaining three UPSs of the A-feed have more then enough capacity. The replacement will introduce an age difference between the batteries of the A-feed and the batteries of the B-feed. This is on purpose, it will improve the availability of the setup.
Affected services:
- Equipment in BIT-2A
Expected impact:
- Possible loss of power redundancy
Customer intervention required: No
Reference number: 164632
Summary:
Our supplier will be performing maintenance on our A-feed UPS in BIT-2A. During this maintenance our supplier will replace the batteries on the A-feed of the UPS with new batteries.
Details:
During the battery replacement, at least one feed will be available continuously. During this maintenance one of the four UPSs of the A-feed will be put in bypass mode. We do not expect any disruption in the A-feed power supply. The remaining three UPSs of the A-feed have more then enough capacity. The replacement will introduce an age difference between the batteries of the A-feed and the batteries of the B-feed. This is on purpose, it will improve the availability of the setup.