- 21-11-24Een goede cloud heeft een kundige dirigent nodig
- 17-10-24ECOFED wint ICT Innovatieprijs Regio Foodvalley 2024
- 01-08-24BIT geeft kaarten weg voor F1 in Zandvoort
- 24-04-24Status.bit.nl in nieuw jasje!
- 12-04-24Nieuw bij BIT: GPU hosting
- 25-03-24BIT breidt netwerkconnectiviteit uit met aansluiting op NL-ix^2
- 13-03-24No More Leaks: Samenwerken tegen cybercriminaliteit
- 03-03-24Geen verandering twee jaar na invoering sancties tegen Russische media: FOIC roept (wederom) op tot einde van ondemocratische censuur
- 29-01-24Onzichtbare upgrades
- 16-01-24BIT's Wido Potters wint Felipe Rodriquez Award voor inzet voor privacy
Periodic maintenance power distribution feed-A BIT-2BCD
27-06-2023 00:00:00
- 27-06-2023 07:00:00
Urgency: Planned
Affected services:
- A-feed BIT-2B
- A-feed BIT-2C
- A-feed BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 185511
Summary:
Periodic maintenance will be carried out on the power distribution of BIT-2BCD.
Details:
Periodic maintenance will be carried out and a thermographic inspection
will be conducted on the power distribution panel of BIT-2BCD. During
this maintenance all main power switches will be serviced, therefore the
UPS systems will be put in bypass mode one at a time.
We do not expect interruption of power to the UPS systems during this
maintenance. In the unlikely event of interruption, the remaining feed
is able to power all the systems. There will always be one feed fully
operational. We strongly advice you to make sure all equipment is
connected to both power feeds.
This entire maintenance will be supervised by BIT engineers.
Update placed at 27/06/2023, 04:12h
This maintenance was completed succesfully at 03.45h. If you have any questions regarding this maintenance, please contact the Customer Care department by phone on +31 (0)318 648 688 or by email on support@bit.nl.
Affected services:
- A-feed BIT-2B
- A-feed BIT-2C
- A-feed BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 185511
Summary:
Periodic maintenance will be carried out on the power distribution of BIT-2BCD.
Details:
Periodic maintenance will be carried out and a thermographic inspection
will be conducted on the power distribution panel of BIT-2BCD. During
this maintenance all main power switches will be serviced, therefore the
UPS systems will be put in bypass mode one at a time.
We do not expect interruption of power to the UPS systems during this
maintenance. In the unlikely event of interruption, the remaining feed
is able to power all the systems. There will always be one feed fully
operational. We strongly advice you to make sure all equipment is
connected to both power feeds.
This entire maintenance will be supervised by BIT engineers.
Update placed at 27/06/2023, 04:12h
This maintenance was completed succesfully at 03.45h. If you have any questions regarding this maintenance, please contact the Customer Care department by phone on +31 (0)318 648 688 or by email on support@bit.nl.