- 08-04-25Maintenance upload.bit.nl
- 03-04-25Periodic maintenance cooling system BIT-2BCD
- 31-03-25Periodic maintenance cooling system BIT-2A
- 26-03-25Maintenance Microsoft SQL instances servers
- 23-03-25Periodic maintenance cooling system BIT-1
- 19-03-25Maintenance core routers BIT-1 and BIT-2A
- 20-02-25Periodic maintenance generatorswitch and transformerswitch BIT-2A
- 19-02-25Maintenance building management system
- 12-02-25Cancelled: Maintenance core routers BIT-1 and BIT-2A
- 12-02-25Emergency maintenance DWDM equipment in Interxion AMS9
Network maintenance BIT-2A & BIT-2C
Affected services:
- Customers with a network connection to switch "leaf-sw7.bit-2a"
- Customers with a network connection to switch "leaf-sw8.bit-2a"
- Customers with a network connection to switch "leaf-sw1.bit-2c"
- Customers with a network connection to switch "leaf-sw2.bit-2c"
- Customers with a network connection to switch "leaf-sw3.bit-2c"
- Customers with a network connection to switch "leaf-sw4.bit-2c"
Expected impact:
- Disruption of the network connection for approximately 30 minutes during the reboot of the switch
Customer intervention required: No
Reference number: 187579
Summary:
Software of leaf-sw7.bit-2a, leaf-sw8.bit-2a and all four leaf-switches in BIT-2C will be updated.
Details:
The switches will be updated one by one. Due to the update the switches will require a reboot. Customers connected to these switches are expected to have their connection disrupted for approximately 30 minutes.
You can find out which switch you are connected to by checking your invoice or the network statistics in the customer portal.