- 21-11-24Een goede cloud heeft een kundige dirigent nodig
- 17-10-24ECOFED wint ICT Innovatieprijs Regio Foodvalley 2024
- 01-08-24BIT geeft kaarten weg voor F1 in Zandvoort
- 24-04-24Status.bit.nl in nieuw jasje!
- 12-04-24Nieuw bij BIT: GPU hosting
- 25-03-24BIT breidt netwerkconnectiviteit uit met aansluiting op NL-ix^2
- 13-03-24No More Leaks: Samenwerken tegen cybercriminaliteit
- 03-03-24Geen verandering twee jaar na invoering sancties tegen Russische media: FOIC roept (wederom) op tot einde van ondemocratische censuur
- 29-01-24Onzichtbare upgrades
- 16-01-24BIT's Wido Potters wint Felipe Rodriquez Award voor inzet voor privacy
Fiber maintenance BIT-1 - Equinix AM7
13-12-2023 00:00:00
- 13-12-2023 06:00:00
Urgency: Planned
Affected services:
- internet connectivity
- customer wavelength on this path
Impact:
- internet traffic will be rerouted automatically
- customer wavelength will be disrupted for several minutes
Customer intervention required: No
Reference number: 187932
Summary:
The fiber between BIT-1 and Equinix AM7 will be replaced with a new fiber from a different vendor. As a result, all waves on this fiber will be disrupted for several minutes. Internet traffic will be rerouted via other paths.
Details:
In this maintenance window the new fiber will be connected to our DWDM equipment.
Update placed at 13/12/2023, 2:37h
This maintenance was completed successfully at 2.00h.
Affected services:
- internet connectivity
- customer wavelength on this path
Impact:
- internet traffic will be rerouted automatically
- customer wavelength will be disrupted for several minutes
Customer intervention required: No
Reference number: 187932
Summary:
The fiber between BIT-1 and Equinix AM7 will be replaced with a new fiber from a different vendor. As a result, all waves on this fiber will be disrupted for several minutes. Internet traffic will be rerouted via other paths.
Details:
In this maintenance window the new fiber will be connected to our DWDM equipment.
Update placed at 13/12/2023, 2:37h
This maintenance was completed successfully at 2.00h.