- 01-08-24Periodic maintenance fire detection and suppression system BIT-1
- 17-07-24Moving core network equipment in BIT-1
- 16-07-24Moving core network equipment in BIT-1
- 03-07-24Maintenance Microsoft SQL instances servers
- 02-07-24Fiber maintenance BIT-2 - Interxion Science Park (AMS9)
- 28-06-24Maintenance power generators BIT-2A
- 11-06-24Black building emergency power test BIT-2
- 11-06-24Maintenance management software virtualisation platform
- 04-06-24Black building emergency power test BIT-1
- 31-05-24Maintenance UPS sets BIT-2B
Moving core network equipment in BIT-1
17-07-2024 00:00:00
- 17-07-2024 06:00:00
Urgency: Planned
Affected services:
- Internet access
- Customer wavelengths between BIT-1 and Equinix AM7
Expected impact:
- Internet traffic will be rerouted via different paths
- Disruption dedicated customer wavelengths
- Disruption FTTO
- Reduced redundancy for:
-- Loadbalanced services
-- Internet access
-- Core network
Customer intervention required: No
Reference number: 192714
Summary:
The core network equipment in BIT-1 will be moved to a new rack.
Details:
On July 16 and 17, maintenance will be performed on the core network equipment at BIT-1 between 00:00 and 06:00. The equipment and connections will be moved to a new rack in BIT-1. This is necessary to make room for newer racks and infrastructure. To move the equipment, it will be powered down and disconnected.
Affected services:
- Internet access
- Customer wavelengths between BIT-1 and Equinix AM7
Expected impact:
- Internet traffic will be rerouted via different paths
- Disruption dedicated customer wavelengths
- Disruption FTTO
- Reduced redundancy for:
-- Loadbalanced services
-- Internet access
-- Core network
Customer intervention required: No
Reference number: 192714
Summary:
The core network equipment in BIT-1 will be moved to a new rack.
Details:
On July 16 and 17, maintenance will be performed on the core network equipment at BIT-1 between 00:00 and 06:00. The equipment and connections will be moved to a new rack in BIT-1. This is necessary to make room for newer racks and infrastructure. To move the equipment, it will be powered down and disconnected.