- 05-02-25Periodic maintenance fire detection and suppression system BIT-1
- 13-01-25Periodic maintenance power generators BIT-2A
- 13-01-25Periodic maintenance power generators BIT-2BCD
- 13-01-25Periodic maintenance power generator BIT-1
- 09-01-25Maintenance management software virtualisation platform
- 02-01-25Adaptation temperature datacenter BIT-1/BIT-2ABCD
- 20-12-24Periodic maintenance on all cooling pumps of BIT-2
- 20-12-24Periodic maintenance fire suppression BIT-2ABCD
- 20-12-24Periodic maintenance fire suppression BIT-1
- 19-12-24Maintenance shared MySQL databases
Periodic maintenance cooling system BIT-2BCD
14-10-2024 08:00:00
- 29-10-2024 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2BCD
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 194115
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2BCD.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center.
The chillers of BIT-2BCD will be shut down for maintenance one at a time as well. The remaining three chillers have sufficient capacity to cool the data center.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
Affected services:
- Colocation in BIT-2BCD
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 194115
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2BCD.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center.
The chillers of BIT-2BCD will be shut down for maintenance one at a time as well. The remaining three chillers have sufficient capacity to cool the data center.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.