- 31-10-24Maintenance mail services and shared webhosting services
- 28-10-24Periodic maintenance cooling system BIT-1
- 14-10-24Periodic maintenance cooling system BIT-2A
- 14-10-24Periodic maintenance cooling system BIT-2BCD
- 14-10-24Maintenance UPS BIT-2D B-Feed
- 10-10-24Network maintenance BIT-2A
- 09-10-24Network maintenance BIT-1 & BIT-2D
- 09-10-24Maintenance statistics in the BIT portal
- 07-10-24Certification fire alarm and gas extinguishing system BIT-1, BIT-2A and BIT-2BCD
- 07-10-24Maintenance power generators BIT-2A
Maintenance UPS BIT-2D B-Feed
14-10-2024 07:00:00
- 16-10-2024 17:30:00
Urgency: Planned
Affected services: Equipment in BIT-2D
Expected impact: Geen
Customer intervention required: No
Reference number: 188041
Summary:
From Monday 14 October to Wednesday 16 October, our supplier will perform maintenance on the UPS (B-Feed) in BIT-2D between 07:00 and 17:30. During the maintenance, the batteries of the B-feed will be replaced.
Details:
During the maintenance, 25% of the batteries will be disconnected at a time. The UPS set are designed in a modular way, so 75% of the battery capacity for each feed will still be available. This capacity is sufficient to handle a power outage from the grid for approximately 20 minutes.
In the unlikely event that the feed of a particular UPS set is interrupted during the maintenance, the other feed will remain operational. We strongly advise you to double-check if all your equipment is connected to both feeds.
Affected services: Equipment in BIT-2D
Expected impact: Geen
Customer intervention required: No
Reference number: 188041
Summary:
From Monday 14 October to Wednesday 16 October, our supplier will perform maintenance on the UPS (B-Feed) in BIT-2D between 07:00 and 17:30. During the maintenance, the batteries of the B-feed will be replaced.
Details:
During the maintenance, 25% of the batteries will be disconnected at a time. The UPS set are designed in a modular way, so 75% of the battery capacity for each feed will still be available. This capacity is sufficient to handle a power outage from the grid for approximately 20 minutes.
In the unlikely event that the feed of a particular UPS set is interrupted during the maintenance, the other feed will remain operational. We strongly advise you to double-check if all your equipment is connected to both feeds.