Periodic maintenance on all cooling pumps of BIT-2

Periodic maintenance on all cooling pumps of BIT-2

20-12-2024 08:00:00 - 20-12-2024 17:30:00

Urgency: Planned
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 194816

Summary:

Periodic maintenance on the cooling pumps in BIT-2.

Details:

On Friday 20 December between 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.