Maintenance UPS sets BIT-2A
12-05-2025 07:00:00
- 13-05-2025 17:30:00
Urgency: Planned
Affected services: Equipment in BIT-2A
Expected impact: None
Customer intervention required: No
Reference number: 197284
Summary:
On Monday, May 12th, and Teusday, May 13th, between 07:00 and 17:30 hrs, our supplier will be performing maintenance on the UPS systems in BIT-2A. Both power feeds will be available during the maintenance.
Details:
For this maintenance, 1 of the 4 UPS systems per power feed will be put into bypass mode. This will not result in any interruption in the power supply on the feed that is being worked on.
The maintenance will take place every workday between 07:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
Affected services: Equipment in BIT-2A
Expected impact: None
Customer intervention required: No
Reference number: 197284
Summary:
On Monday, May 12th, and Teusday, May 13th, between 07:00 and 17:30 hrs, our supplier will be performing maintenance on the UPS systems in BIT-2A. Both power feeds will be available during the maintenance.
Details:
For this maintenance, 1 of the 4 UPS systems per power feed will be put into bypass mode. This will not result in any interruption in the power supply on the feed that is being worked on.
The maintenance will take place every workday between 07:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.